We're building a WagAero "Sport Trainer". They claim it to be an accurate replica of the Piper Cub. |
|
|
|
|
|
|
|
|
|
|
|
|
Before starting the project we built a jig for the fuselage sides. It's a table 3feet wide and 20 feet long. Painted gray (because that's what we had) |
|
We than drew the sides full scale. |
|
|
|
|
|
|
|
|
|
|
|
Monday, 16 March 09 we recieved the fuselage "Kit". Actually it was a box of fittings and a long tube with 4130 tubes in it. |
|
We got to work filling the jig with the tubing. Here, Sam and John are grinding "fish mouths" in the tubes. |
|
|
|
|
|
|
|
|
|
|
Sam is measuring for the next tube. |
|
|
|
|
|
|
|
|
|
|
|
|
Monday night, the jig is filled with the first fuselage side. |
|
|
|
|
|
|
|
|
|
|
|
|
More pipe going into the jig. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Janet, John, Sam and Danny after only two days. Both sides already tack welded. |
|
|
|
|
|
|
|
|
|
|
|
|
Two days into the project, two sides tack welded. |
|
|
|
|
|
|
|
|
|
|
|
|
|
THE ONE! The one good tack that John was credited with. |
|
|
|
|
|
|
|
|
|
|
|
|
Wednesday, 18 Mar 09. 3 days into the project and the fuse is standing up, Bottom and top tacked. |
|
|
|
|
|
|
|
|
|
|
|
|
Thursday, Seth stops by to make airplane noises. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Friday, 20 March 09. Danny starts the long process of finish welding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The end of the day Friday 20 March. |
|
|
|
|
|
|
|
|
|
|
|
|
Tuesday, 24 March 09. Sam and John start the top of the fuselage. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
End of the day, 25 March 09. |
|
|
|
|
|
|
|
|
|
|
|
|
End of the day, 25 March 09. |
|
|
|
|
|
|
|
|
|
|
|
|
End of the day, 25 March 09. |
|
|
|
|
|
|
|
|
|
|
|
|
End of the day, 25 March 09. |
|
|
|
|
|
|
|
|
|
|
|
|
End of the day, 25 March 09. Fuse is tack welded. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wing structure on hold, waiting for bolts. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sizing up the tail feathers |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Starting the horizontal stabs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Danny building a jig for the compression sruts |
|
|
|
|
|
|
|
|
|
|
|
|
|
Tacking the compression struts |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Elevator bell-crank fitting |
|
|
|
|
|
|
|
|
|
|
|
|
Rigging to get the torque tube installed |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Heavy duty antenna mount. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sam, grinding the welds on the tail post down a bit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
End of the day, 16 April 09. One month after starting the project the fuse is essentially done. Waiting on deliverys from WagAero. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
End of the day 16 April 09. The shop is just about empty while we wait for parts from WagAero. |
|
|
|
|
|
|
|
|
|
|
|
|
Still, no bolts from WagAero. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Parts! We finally got the shipment of parts so construction will resume. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Unfortunately, the firewall/cowling was damaged in shipment. Notice the dents are from the inside out. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Windows, well one of them anyway. |
|
|
|
|
|
|
|
|
|
|